Advertisement

Ad promo image large
  • Published Date

    October 22, 2024
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

NOTICE OF AVAILABILITY DRAFT ENVIRONMENTAL ASSESSMENT AND PROPOSED FINDING OF NO SIGNIFICANT IMPACT FOR F-22 FUEL DISPENSING SYSTEM FOR JOINT BASE ELMENDORF-RICHARDSON, ALASKA An Environmental Assessment (EA) has been prepared to analyze the potential impacts of constructing new fueling infrastructure necessary to support the fifth generation F-22 fighter aircraft and demolishing existing Tank Farm 5 at Joint Base Elmendorf-Richardson (JBER) to meet the current 3rd Wing/673d Logistics Readiness Squadron's fuel storage and fueling needs. The proposed action would construct two 5,000-barrel (210,000 gallon) above-ground storage tanks for jet propulsion fuel, a pumphouse, a four-position truck fillstand, two position offload stand and a connection to the existing transfer pipeline. The proposed action also includes demolition of the existing Tank Farm 5. The EA, prepared in accordance with the National Environmental Policy Act (NEPA), Council on Environmental Quality regulations, and Air Force regulations implementing NEPA, evaluates the environmental effects of the proposed action and alternatives, including the No Action Alternative. Based on this analysis, the Air Force has prepared a proposed Finding of No Significant Impact (FONSI). The Draft EA and proposed FONSI are available for review at the following locations: Joint Base Elmendorf-Richardson Library, Bldg. 7, JBER-R, AK 99505 Z.J. Loussac Library, 3600 Denali Street, Anchorage, AK 99503 Chugiak-Eagle River Library, 12001 Business Boulevard 176, Eagle River Town Center, Eagle River, AK 99577 Electronic copies of the documents can also be found on the JBER website at https://www.jber.jb.mil/Services-Resources/Environmental/Environmental-Planning/ Comments received by 15 November 2024 will be considered in preparation of the Final Environmental Assessment. Comments should be provided to JBER by email at 673CES.CEIEC.EnvPlanning@us.af.mil or voicemail at (907) 384-7526. PRIVACY ADVISORY NOTICE Public comments on this Draft EA are requested pursuant to NEPA, 42 United States Code 4321, et seq. All written comments received during the comment period will be made available to the public and considered during the Final EA preparation. Providing private address information with your comment is voluntary and such personal information will be kept confidential unless release is required by law. However, address information will be used to compile the project mailing list and failure to provide it will result in your name not being included on the mailing list. NOTICE OF AVAILABILITY DRAFT ENVIRONMENTAL ASSESSMENT AND PROPOSED FINDING OF NO SIGNIFICANT IMPACT FOR F - 22 FUEL DISPENSING SYSTEM FOR JOINT BASE ELMENDORF - RICHARDSON , ALASKA An Environmental Assessment ( EA ) has been prepared to analyze the potential impacts of constructing new fueling infrastructure necessary to support the fifth generation F - 22 fighter aircraft and demolishing existing Tank Farm 5 at Joint Base Elmendorf - Richardson ( JBER ) to meet the current 3rd Wing / 673d Logistics Readiness Squadron's fuel storage and fueling needs . The proposed action would construct two 5,000 - barrel ( 210,000 gallon ) above - ground storage tanks for jet propulsion fuel , a pumphouse , a four - position truck fillstand , two position offload stand and a connection to the existing transfer pipeline . The proposed action also includes demolition of the existing Tank Farm 5 . The EA , prepared in accordance with the National Environmental Policy Act ( NEPA ) , Council on Environmental Quality regulations , and Air Force regulations implementing NEPA , evaluates the environmental effects of the proposed action and alternatives , including the No Action Alternative . Based on this analysis , the Air Force has prepared a proposed Finding of No Significant Impact ( FONSI ) . The Draft EA and proposed FONSI are available for review at the following locations : Joint Base Elmendorf - Richardson Library , Bldg . 7 , JBER - R , AK 99505 Z.J . Loussac Library , 3600 Denali Street , Anchorage , AK 99503 Chugiak - Eagle River Library , 12001 Business Boulevard 176 , Eagle River Town Center , Eagle River , AK 99577 Electronic copies of the documents can also be found on the JBER website at https://www.jber.jb.mil/Services-Resources/Environmental/Environmental-Planning/ Comments received by 15 November 2024 will be considered in preparation of the Final Environmental Assessment . Comments should be provided to JBER by email at 673CES.CEIEC.EnvPlanning@us.af.mil or voicemail at ( 907 ) 384-7526 . PRIVACY ADVISORY NOTICE Public comments on this Draft EA are requested pursuant to NEPA , 42 United States Code 4321 , et seq . All written comments received during the comment period will be made available to the public and considered during the Final EA preparation . Providing private address information with your comment is voluntary and such personal information will be kept confidential unless release is required by law . However , address information will be used to compile the project mailing list and failure to provide it will result in your name not being included on the mailing list .